product details / scope of delivery
Standing height 1.50 or 1.60 m in connection
with pit length selectable at options.
Description:
Maintenance pit / Test pit
Double wall design
The double wall prefabricated pit includes
- Top pit frame to accommodate covers
- Beam in the head area to accommodate a pit jack with support system up to 15.0 t / a waste oil collector / or similar
- Bottom grating in hot-dip galvanised grating design, slip-resistant R12
- Optionally selectable are pit lanes, electric supply with sockets, pit lighting, compressed air supply, oil disposal, installation frames for roller test benches and axle play testers, rails for floor-running pit jacks
- Pit bottom with slope to pump sump/drain
- Piping forventilating prefabricated pit with central air outlet
- Coating inside prefabricated pit: 2-component active primer / 2-comp. top coat in RAL 7040
- End and side walls in double wall design for the on-site concrete filling acc. to construction stage description
- Supporting feet incl. safety heavy-duty anchors for fastening the prefabricated pit on base plate
The prefabricated pit meets the requirements of
water protection acc. to WHG/VAwS (AwSV)/TRwS (779/785/786)
and the requirements of occupational health and safety
acc. to ArbSchG/BetrSichV (Germany)
--------------------------------------------------------------
Special TRUCKBAY payment terms:
50% down payment upon order placement
40% when ready for delivery
10% after installation
Production does not start until the installation drawing has
been approved and after receipt of the down payment.
All positions are net prices.
Technical Data
Technical data:
Pit opening | 1.02 m |
Lower pit width | 1.62 m |
Support profile | Roll cover |
Pit jack and support system | U 260 |
Load | designed as per SLW60, DIN EN 1991-1-1:2010-12 |
DIN EN 1991-1-1/NA:2010-12 | |
DIN technical report 101:2009-03 | |
and DIN 4085 supplementary sheet 1:2011-12 | |
Surface load | 60 t |
Axle load | 20 t |